
Custom Deck Building & Composite Decking
Framed for salt air, finished for bare feet
- Free Estimates
- Hampton Bays Based
- 20 Years Experience
What this service actually involves
On the East End a deck lives in salt air, wind and freeze-thaw, so the framing matters more than the decking. We use properly sized joists, hot-dip or stainless hardware, joist tape and correct ledger flashing so the structure outlasts the surface. On top you get the board you want — mahogany, cedar, or composite — installed with hidden fasteners and picture-frame borders so there are no exposed screw heads underfoot.
Every project runs the same way: measured on site, written up clearly, and built by the crew that quoted it. You deal with Wilson directly rather than a rotating cast of subcontractors.
Included in every decks & composite decking project
- New deck design, framing and construction
- Composite, mahogany, cedar and pressure-treated decking
- Hidden fastener systems and picture-frame borders
- Correct ledger flashing and joist protection tape
- Stainless and hot-dip galvanized structural hardware
- Railing systems, stairs, benches and privacy screening
Four steps from first call to final walkthrough
Site & Layout
We review grade, drainage, access and how you plan to actually use the deck.
Structure First
Footings, ledger, flashing and framing are built and inspected before any boards go down.
Deck & Rail
Boards are laid with hidden fasteners, then stairs and railing systems are installed.
Detail & Clean
Borders, fascia and trim completed, hardware checked, and the site cleared.
Detail-driven from start to finish
Premium results come from disciplined habits, not shortcuts. This is the standard we hold ourselves to on every project, whatever its size.
Clear Communication
Straight answers, written scope and a weekly update on where the project stands.
Measured On Site
Everything is measured to the house as built — no assuming a wall is plumb or an opening is square.
Real Preparation
Backing, blocking and substrate work done before finish work starts, not improvised around later.
Materials That Suit the Job
Species, grade and hardware selected for the location and the way the space is actually used.
Respect for the Property
Floors and fixtures protected, dust contained, and the site cleaned before we leave each day.
Final Walkthrough
We walk the punch list with you and sign it off together before the project is called complete.
Questions, answered
Related services
Custom Cabinetry Installation & Refacing
Shop-built cabinetry, scribed and installed to the room
Learn More about Custom Cabinetry Installation & RefacingFinish Carpentry & Precision Trim Work
Tight joints, clean reveals, no filler doing the hard work
Learn More about Finish Carpentry & Precision Trim WorkCrown Molding, Baseboard & Chair Rail
Profiles scaled to the room, not to the box store
Learn More about Crown Molding, Baseboard & Chair Rail