
Whole-Home Remodeling & Additions
Six-month projects run with a plan, not a guess
- Free Estimates
- Hampton Bays Based
- 20 Years Experience
What this service actually involves
We regularly take on projects that run six to seven months, and the difference between a good one and a painful one is sequencing. We plan the trade order, lead times and inspection points before demolition starts, keep the occupied parts of the house protected and usable, and give you a straight answer about where things stand. Additions, second-story build-outs, attic conversions and full interior renovations all run the same way.
Every project runs the same way: measured on site, written up clearly, and built by the crew that quoted it. You deal with Wilson directly rather than a rotating cast of subcontractors.
Included in every remodeling & additions project
- Whole-house interior and exterior renovation
- Additions, second-story build-outs and sunrooms
- Basement finishing and attic conversions
- Structural framing, wall removal and timber repair
- Historic and coastal home restoration carpentry
- Trade coordination, scheduling and inspection management
Four steps from first call to final walkthrough
Scope & Schedule
We define the full scope, sequence the trades and set realistic milestone dates.
Protect & Demo
Occupied areas are sealed and protected before demolition and structural work begin.
Build Out
Framing, mechanical rough-ins, insulation, drywall and millwork proceed in order.
Finish & Hand Over
Finishes, trim and the punch list are completed and the house handed back clean.
Detail-driven from start to finish
Premium results come from disciplined habits, not shortcuts. This is the standard we hold ourselves to on every project, whatever its size.
Clear Communication
Straight answers, written scope and a weekly update on where the project stands.
Measured On Site
Everything is measured to the house as built — no assuming a wall is plumb or an opening is square.
Real Preparation
Backing, blocking and substrate work done before finish work starts, not improvised around later.
Materials That Suit the Job
Species, grade and hardware selected for the location and the way the space is actually used.
Respect for the Property
Floors and fixtures protected, dust contained, and the site cleaned before we leave each day.
Final Walkthrough
We walk the punch list with you and sign it off together before the project is called complete.
Questions, answered
Related services
Custom Cabinetry Installation & Refacing
Shop-built cabinetry, scribed and installed to the room
Learn More about Custom Cabinetry Installation & RefacingFinish Carpentry & Precision Trim Work
Tight joints, clean reveals, no filler doing the hard work
Learn More about Finish Carpentry & Precision Trim WorkCrown Molding, Baseboard & Chair Rail
Profiles scaled to the room, not to the box store
Learn More about Crown Molding, Baseboard & Chair Rail